The Unofficial
I-26 Construction
Madison County
North Carolina
Pages

 

A 150 ton earthmoving vehicle moves up the temporary haul road built through Area #2. The slope to the right was cut through so the haul road would not be steeper than the big vehicles could safely travel. It is not at the final grade; that is still about 100' below this elevation. Taken in July 1999.


 
Previous
Next


Index

Guestbook
 John Lansford
29 August 1999