The Unofficial
I-26 Construction
Madison County
North Carolina
Pages

 

The fill in the foreground is now almost completed; it used to be a valley around a 100' in depth. A truck escape ramp will be built on top of the fill on the left side, and the scenic overlook will be built along the ridge on the right hand side. Area #2 is visible directly through the cut in the background. Photo taken January 2000.


 
Previous
Next


Index

Guestbook
 John Lansford
30 January 2000