This photo was taken in August 2002 by the Resident Engineer, Stan Hyatt. All the concrete for the paving project was mixed on site in this batch plant, located on Waste Site #2 just north of Buckner Gap in the background. The piles of sand and gravel were mixed with cement in the plant, then trucked to where the paving operation was taking place that day. The sand had to be brought in from South Carolina, but the gravel was crushed from rock blasted from the project.


 